Guides
Warehouse layout, pick-pack flow, packing-station speed and the numbers that show whether it is working.
-
Customer data on shipping labels and packing slips: what the DPDP Rules change from 13 May 2027
The DPDP Rules apply in full from 13 May 2027. What a D2C dispatch floor should print, keep, shred and report, with a data map for labels and slips.
-
E-invoices and e-way bills for D2C dispatch in 2027: the rules your dispatch desk must follow
Which D2C dispatches need an IRN or an e-way bill in 2027, the 30-day and 180-day portal limits, and what the 57th GST Council recommended.
-
Festive peak 2027: a warehouse capacity plan from Navratri (30 September) to Bhai Dooj (31 October)
Diwali 2027 falls on 29 October, ten days earlier than in 2026. A week-by-week plan for packers, stations, packaging stock and courier cut-offs.
-
Labour Codes in 2027: a compliance checklist for warehouses and fulfilment centres
Is your fulfilment centre a factory under the OSH Code? Registration, appointment letters, contract labour, overtime, night shifts and the 2027 dates.
-
US orders after the de minimis ends on 1 July 2027: what changes at the packing station
Duty-free US entry under $800 ends by law on 1 July 2027. The item data, documents and origin marks an Indian D2C packing station now has to handle.
-
Choosing a 3PL or courier partner in India: questions to ask
What to ask a 3PL or courier partner in India before you sign: pin-code coverage, COD money, RTO, weight disputes, SLAs, GST and how you exit.
-
Warehouse layout for a growing D2C brand: zones and slotting
Lay out a D2C warehouse for speed: the zones in the order goods move, U or straight flow, ABC slotting from your own order data, and when to change it.
-
Designing a fast packing station for D2C: layout, reach and flow
Lay out a D2C packing station so packers never walk mid-order: six zones, reach and height, one-way flow, refills, scanners and a way to time each order.
-
Packing KPIs to track every week: orders per hour, accuracy and more
Six packing KPIs for a D2C floor: orders per packer-hour, accuracy, damage, consumables per order, cut-off and backlog, with a one-page weekly board.
-
Pick, pack, dispatch: how to cut mis-shipments
Wrong size, short, swapped or never handed over: the checks at pick, pack and dispatch that stop mis-shipments, and a simple log that finds the cause.